| OYS 13542 PPSHP Phase 2.1 Between 2021 and 2023, Nord Raudoitus Oy carried out the reinforcement and formwork works for the F Building at Oulu University Hospital. A total of 1,200,000 kg of reinforcement was installed during the project. Client: NCC Suomi Oy |