PROJECTS

Oosinselkä wind farm, Pori
2022-2023
  • 15 ANCHOR CAGES
  • 4 GRAVITY FOUNDATIONs
  • 11 ROCK ANCHOR FOUNDATIONs
  • REINFORCEMENT 704 000 kg
  • EARTHING
  • PIPEWORK
Eltoneva AND KosolankanGAS SUBSTATION, Lestijärvi
2022-2023
Hittisenneva and Iso-Korteneva wind farms, Lestijärvi
2022-2023
Vuosaari VuC production building for thermal energy, Helsinki
2020-2022
  • 1 500 000 kg
Koskisen Saha B02, Lahti
2022
  • 94 600 kg
Suodenniemen tuulipuisto, Sastamala
2022
  • 75 800 kg
Vt13 MyttiönmäKI BRIDGE, Savitaipale
2022
  • 130 700 kg
Matkussaari wind farm, Kurikka
2022
  • 27 ANCHOR CAGES
  • 22 GRAVITY FOUNDATIONS
  • 5 ROCK ANCHOR FOUNDATIONS
  • REINFORCEMENT 2 440 000 kg
  • EARTHING
  • PIPEWORK
  • FORMWORK
Kalistaneva wind farm, Kurikka
2022
  • 30 anchor cages
  • 19 gravity foundations
  • 11 rock anchor foundations
  • Reinforcement 2 300 000 kg
  • earthing
  • pipework
  • formwork
Tolpanvaara wind farm, Pudasjärvi
2022
  • 13 anchor cages
  • 4 gravity foundations
  • 9 rock anchor foundations
  • Reinforcement 768 000 kg
  • earthing
  • Pipework
  • crane operating
Murtomäki wind farm, Pyhäjärvi
2022
  • 15 anchor cages
  • 2 gravity foundations
  • 13 rock anchor foundations
  • Reinforcement 727 000 kg
  • earthing
  • pipework
Torvenkylä wind farm, Kalajoki
2022
  • 7 anchor cages
  • 7 gravity foundations
  • Reinforcement 513 000 kg
  • earthing
  • pipework
  • formwork
Soidinmäki wind farm, Saarijärvi
2022
  • 7 anchor cages
  • 2 gravity foundations
  • 5 rock anchor foundations
  • Reinforcement 351 000 kg
MetsäFibre, Kemi
2022
K-citymarket Lielahti, Tampere
2022
Läntinen
wind farm
2021
  • 14 anchor cages
  • 12 gravity foundations
  • 2 rock anchor foundations
  • Reinforcement 1 560 000 kg
  • earthing
  • pipework
Norrskogen wind farm
2021
  • 6 anchor cages, 6 foundations
  • Reinforcement 660 000 kg
  • earthing
  • Pipework
  • formwork
Murtotuuli wind farm
2021
  • 21 anchor cages, 21 foundations
  • Reinforcement 1 600 000 kg
  • earthing
  • pipework
Takanebacken wind farm
2021
  • 5 anchor cages
  • Reinforcement 540 000 kg
  • earthing
  • pipework
  • formwork
Mutkalampi wind farm
2021
  • 44 anchor cages
  • 42 gravity foundations
  • 2 rock anchor foundations
  • Reinforcement 5 330 000 kg
  • earthing
  • pipework
  • formwork
Isoneva
wind farm
2021
  • 21 anchor cages, 21 foundations
  • Reinforcement 2 050 000 kg
  • earthing
  • pipework
Rustari
wind farm
2021
  • 8 anchor cages, 8 foundations
  • Reinforcement 600 000 kg
  • earthing
  • pipework
  • formwork
Kokkoneva
wind farm
2021
  • 9 anchor cages, 9 foundations
  • reinforcement 860 000 kg
  • earthing
  • pipework
Mastokangas
wind farm
2021
  • 12 anchor cages, 12 foundations
  • reinforcement 1 260 000 kg
  • earthing
  • pipework
PPSHP, HOSPITAL
1. STAGE, BUILDING A
2021
  • Reinforcement 1 100 000 kg
Lakiakangas 3 wind farm
2021
  • 20 anchor cages
  • 14 gravity foundations
  • 6 rock anchor foundations
  • reinforcement 1 150 000kg
  • concrete 1650m3
  • earthing and pipework
Metsälamminkangas
wind farm
2021
  • 24 anchor cages, 24 foundations
  • reinforcement 940 000 kg
  • earthing, pipework and formwork
  • concrete 6 000 m3
SRV parking hall,
Oulu
2021
Leväsuo substation, Oulu
2021
  • 36 400 kg
UPM Kymi, Utin Rakennus Oy, Kouvola
2021
Kröpuln and Storbacken
wind farms
2020
  • 14 anchor cages, 14 foundations
  • reinforcement 1 130 000 kg
  • earthing and pipework
Konttisuo
wind farm
2020
  • 7 anchor cages, 7 foundations
  • reinforcement 700 000 kg
  • earthing and pipework
Tyrinselkä 2,
wind farm
2020
  • 4 anchor cages, 4 foundations
  • Reinforcement 390 000 kg
  • earthing, pipework and formwork
Paskoonharju wind farm, TEUVA
2020
  • 21 anchor cages
  • 21 gravity foundations
  • Reinforcement 2 135 000 kg
  • concrete 17 000 m3
  • earthing and pipework
  • formwork
Piiparimäki wind farm,
PYHÄNTÄ
2020
  • 19 ANCHOR CAGES
  • 11 GravitY FOUNDATIONS
  • 8 ROCK ANCHOR FOUNDATIONS
  • REINFORCEMENT 1 225 000 kg
  • EARTHING AND PIPEWORK
Saunamaa wind farm,
TEUVA
2020
  • 7 anchor cages
  • 7 gravity foundations
  • reinforcement 510 000 kg
  • concrete 6 000 m3
  • earthing and pipework
  • formwork
OX2 Korkeakangas
wind farm, KARSTULA
2020
  • 9 ANCHOR CAGES
  • 6 GRAVITY FOUNDATIONS
  • 3 ROCK ANCHOR FOUNDATIONS
  • REINFORCEMENT 550 000 kg
  • EARTHING AND PIPEWORK
VT 12 Valtari,
LAHTI
2020
  • REINFORCEMENT 1 000 000 kg
Sarvisuo wind farm,
SIMO
2020
  • 27 ANCHOR CAGES
  • 25 ROCK ANCHOR FOUNDATIONS
  • 2 GRAVITY FOUNDATIONS
  • Raudoitus 1 280 000 kg
  • CONCRETING 10 000 m3
  • EARTHING AND PIPEWORK
  • FORMWORK
LielahTI DAY CARE,
TAMPERE
2020
  • REINFORCEMENT
  • FORMWORK
  • CASTING
Läntisen Tarvonsilta, BRIDGE, ESPOO
2020
  • REINFORCEMENT 1 000 000 kg
Kiruna Bro, BRIDGE, KIRUNA, SWEDEN
2020
  • REINFORCEMENT 270 000 kg
  • FORMWORK
Mahtiparkki PARKING HALL, hELSINKI
2020
  • REINFORCEMENT 260 000 kg
Brattmyrliden WIND FARM, BRATTMYRLIDEN, SWEDEN
2020
  • 19 anchor cages
  • 19 rock anchor foundations
  • Reinforcement 475 000 kg
  • concreting 5 000 m3
  • earthing and pipework
  • formwork
Kalax wind farm,
NÄRPIÖ
2020
  • 21 anchor cages
  • 20 rock anchor foundations
  • 1 gravity foundations
  • Reinforcement 480 000 kg
  • concreting 8 500 m3
  • earthing and pipework
  • formwork
Oltava wind farm,
PYHÄJOKI
2020
  • 5 gravity foundations
  • reinforcement 250 000 kg
  • earthing and pipework
  • formwork
  • 5 anchor cages
Kauppakeskus Lippulaiva, shopping center, ESPOO
2020
  • H-lohko casting and structures
  • Reinforcement 160 000 kg
Asunto Oy Oulun Mahti, Multi-Storey house, OULU
2020
  • Reinforcement 32 000 kg
Stora Enso B02-2
Sewage basin, OULU
2020
  • reinforcement 66 000 kg
Repairing southern port pier EM3,
HELSINKI
2020
  • REINforcement 65 000 kg
Folioleikkuri, UPM Communication Papers Oy, KOUVOLA
2020
  • Raudoitus 50 000 kg
LPP5 Project, Hamina
2019-2020
Långmossa wind farm, Maalahti
2019
  • 7 anchor cages
  • 7 rock anchor foundations
  • reinforcement 123 500 kg
  • CONCRETING 1 605 m3
  • EARTHING AND PIPEWORK
  • FORMWORK
Ribäcken wind farm,
Maalahti
2019
  • 5 anchor cages
  • 5 rock anchor foundations
  • REINFORCEMENT 79 300 kg
  • CONCRETING 1 130 m3
  • EARTHING AND PIPEWORK
  • FORMWORK
PaltusmäKI WIND FARM,
PYHÄJOKI
2019
  • 3 ANCHOR CAGES
  • 3 GRAVITY FOUNDATIONS
  • REINFORCEMENT 400 000 kg
  • EARTHING AND PIPEWORK
INDUSTRIAL BUILDING Climecon Oy, KAUSALa, suomi
2019
  • REINFORCEMENT FOR THE FOUNDATIONS
  • DELIVERY IN ELEMENTS
Vaisala Oyj, BUILDING 4, VANTAA
2019
  • REINFORCEMENT 250 000 kg
Långmossa WIND FARM, MAALAHTI
2019
  • 7 anchor cages
  • 7 rock anchor foundations
  • REinforcement 123 500 kg
  • concreting 1 605 m3
  • earthing and pipework
  • formwork
Lakiakangas 2,
ISOJOKI
2019
  • In co-operation with Penan Raudoitus Oy
  • 6 anchor cages
  • 6 gravity foundations
  • Reinforcement 451 000 kg
Hedet wind farm,
NÄRPIÖ
2019
  • 12 anchor cages
  • 12 gravity foundations
  • Reinforcement 940 000 kg
Metsä Board KARK 2019, ÄÄNEKOSKI
2019
  • Reinforcement 70 000 kg
Tärttämäen silta,
bridge, ÄÄNEKOSKI
2018
  • Reinforcement work
expanding Fortum Kivenlahti production building for thermal energy, ESPOO
2018
  • reinforcement work
  • formwork
  • concreting
OEBIO Laanila power plant,
OULU
2018
  • in co-operation with Penan Raudoitus OY
  • SLIP CASTING
Ylivieska changes in structural arrangements, YLIVIESKA
2018
  • Reinforcement 400 000 kg
Year 2022 was a year of a great accomplishment: Nord Raudoitus has built over 600 foundations for windmills with its Swedish subsidiary company Nord Armering Ab. In 2022 Nord Raudoitus focused more in building foundations for green energy.

2022

During the same year Nord Works Oy was established which is specialized in railway, welding and electricity work. That meant more work and new office workers joined our team. Our current team you can find in our contact page.
Year 2021 has been time to adjust. Due to growth and pandemic we were forced to make major changes in our function and find new solutions to the challenges the pandemic brought. In the beginning of the year we decided that we won't back down but we will keep up our hard-working attitude and specialize even more in wind power and bridge construction.

2021

Year 2020 was quite a roller coaster for all of us. In the beginning of the year Nord Timpurit was established and during summer the function in Sweden had a good kick-off by establishing our subsidiary company Nord Armering Ab. Summer was really busy and 200 employees were working around Finland and Sweden in our logos.

2020

In 2020 we specialized in bridge construction in Sweden and in Finland we specialized in wind power construction. At the end of the year we took some quiet time to prepare ourselves for the next year and to plan next year's processes to beat the challenges we faced due to the pandemic.

2019

In 2019 Nord Raudoitus grew majorly. First office workers started to work with Nord Raudoitus during the summer 2019. Previously there was 50 employees but during the autumn there was over 100 employees in total. At the end of the year we started to work in Sweden and planned the process how to establish a subsidiary company in Sweden.
Nord Raudoitus started in May 2018. We started with wind power, bridges and industrial construction. At the end of the year 2018 we started our first project in Sweden. The first international project was a wind farm in Brattmyrliden.

2018

CHECK OUR PROJECTS

oN THE MAP

for a co-operative company

are you searching

for your project ?

contact us and let's find

the best solution for your needs

You can also send us secured mail with the email below by changing the recipient's first name in the email address:
https://www.turvaposti.fi/viesti/etunimi@nordraudoitus.fi
VAT number: FI29126176
Billing instructions
Сообщение об успешной отправке!